保持道路完好是非常重要的工作。我们需要良好完善的道路,有利经济发展同时,也方便市民的日常往来。道路工程包括重铺路面、重建道路、改善道路的安全及行车状况(加阔现行路面,或建设新的道路,迎合新区域发展的需要)。道路维修也是非常重要的,包括填补人行路面的裂缝,局部修补过早损毁的道路和永久性修补公用事业公司挖掘的路面。多伦多运输署的宗旨是以纳税人支付的最低成本保养道路。
Don Valley Parkway
日期、时间 |
封闭的路段 |
封路原因 |
Weekend Saturday May 14 to Sunday May 15, 2005 |
Full closure between Hwy 401 and the F.G. Gardiner Expressway |
Paving on Southbound Don Valley Parkway at York Mills Road. Wynford Drive bridge painting. TTC track beam replacement at the Bloor viaduct leaside bridge rehabilitaion. |
Sunday, 3:00am to 2:00pm June 5, 2005 |
Full closure between Hwy 401 and the F.G. Gardiner Expressway |
Ride for heart |
Weekend Saturday October 22 to Sunday October 23, 2005 |
Full closure between Hwy 401 and the F.G. Gardiner Expressway |
Changeable message sign. TTC track beam replacement at the Bloor viaduct leaside bridge rehabilitaion. |
F. G. Gardiner Expressway
日期、时间 |
封闭的路段 |
封路原因 |
Sunday 3:00am to 2:00pmJune 5, 2005 |
Full closure between Carlaw Avenue and Humber Bridge |
Ride for heart |
Lake Shore Boulevard
日期、时间 |
封闭的路段 |
封路原因 |
July 8, 9, 10, 2005 |
Exhibition area, partial closure of Lake Shore Blvd., Strachan Ave., Princes’Blvd., Ontario Dr., Manitoba Dr. and Nova Scotia Ave. |
Molson Indy (car racing) |
SaturdayJuly 30, 2005 |
Closed between Strachan Ave. to Colborne Lodge Dr. |
Caribana Parade |
SundaySeptember 25, 2005 |
Closed between Woodbine Ave. and Parkside Dr. |
Waterfront Marathon |